When covering hips and valleys always overlap felt by.
Tamko roofing installation instructions.
For maximum wind resistance along rakes install any tamko.
Cement tamko tam seal roof patch sealant or any adhesive meeting astm d4586 type i on the back of the shingle 1 and 13 in from each side and 1 up from the bottom of the shingle.
House photography throughout this website may have been digitally modified or created using photographs of actual shingles.
Use tamko hip and ridge shingle products for this application.
Then install a full 39 3 8 wide sheet side lapped 2 and end lapped 4.
At tamko the popular heritage shingle series features the best roofing colors on the market that are backed by a brand name recognized for its rich history core values of honesty and integrity quality products and processes authority with building professionals and support for its community.
Long shingle and fasten according to the instructions printed in section 3.
Press shingle firmly into the adhesive.
Prior to making your final color selection tamko recommends viewing an actual roof installation of the same shingle color and manufacturing plant you are considering for the full impact of color blending and patterns.
Extending 24 beyond the center line of the hip or valley.
Surface proper ventilation is essential.
Cut off approximately 2 in.
If tamko sa base nailing is required by local codes see alternate.
Cut holes in the shingles to the correct size to fit over the roof and gable vents.
Nail down the shingles along the top of the roof for the ridge cap.
These shingles should be 5 inches wide and run along the top of the roof.
Join lap 4 10 2cm.
Center a minimum 610 mm 24 wide minimum 28 gauge pre finished galvanized metal valley liner in the valley and fasten with only enough nails to hold it in place nailing at the edges only.
Roof remove the release fi lm and install this half sheet at a right angle to the slope.
Start the first course with a full 36 in.
In these situations hand sealing of the shingles is recommended.
To insure immediate sealing apply 4 quarter sized dabs of tam pro premium sbs adhesive or tamko tam seal adhesive on the back of the shingle 1 25mm and 13 330mm in from each side and 1 25mm up from the bottom of the shingle.
Remove release liner to adhere sa base.
Overlap each metal piece by at least 150 mm 6 and use asphalt plastic cement under each section of overlap.
Be careful to offset the end laps a minimum of 18.